Understanding Tariffs | Energy Core
General
A Tariff can be set at different actor levels to determine the cost of a charging session at a specific charging station.
If a Tariff is not defined at a particular location, a Tariff from a higher level will be used, if defined.
|
Fee Type
|
Public
|
Multi-Residential
|
Private
|
|
Usage > Energy |
V
|
V
|
|
|
Usage > Time |
US / Japan
|
|
|
|
Monthly |
|
V
|
V
|
|
Connection |
V
|
|
|
Note: for Semi-Public usually the payment will not be made via the CSMS.
Overview of Features
Feature 1: Create/update Tariff for energy
Feature 2: Create/update Tariff for monthly fee – private and MR
Feature 3: Create/update Tariff for connection fee – Public
Feature 4: VAT – Start development
Feature 5: Currencies – Start development
Feature 6: buy VS sell – not developed
Feature 7: parking – not developed
How to Access
Log in to Nayax Energy Core -> on the main navigation bar/menu go to Administration > Tariff
Main grid
- By operator
-
- All locations with ‘location usage’ parameter are in grid
-
-
- Regardless of if Tariff exists or not
-
-
- All location must have ‘location usage’ defined (operator>EV infrastructure)
- Parameters
-
- Actor name – operator hierarchy in every level (excl. CS)
-
-
- Grid is Ascending, meaning from the highest level to the lowest
-
-
- Location usage – configured in Operator>EV Infrastructure
-
-
- Field affects fee (monthly or connection)
-
-
- Energy pricing strategy – to allow operators max capabilities, preconfigures strategy so operators can simply choose from list and define amount to bill
-
-
- Strategies can easily be added – talk to product
-
-
- Description – quick overview of active fee
-
- Connection/Monthly Fee – depending on location usage
-
-
- Both cant co-exist
-
-
-
- All prices in screen are Excl. VAT
-
-
- Actor hierarchy – shows tree drilldown
Monthly / Connection
|
Strategy Name |
Description |
|
Fixed Price |
Price end user will be charged by. |
|
Taoz Base + Margin |
Add the markup on top of Taoz base. |
|
IEC Beity Base + Margin |
Add the markup on top of IEC Beity base. |
|
Advanced Taoz Pricing |
|
|
Taoz Margin by Slice |
Each tier can be billed by a different markup. Allows you to give different margin for each slice, e.g., Shefel 0.30 and Pisga 0.20. |
|
Conditional Taoz Margin |
If slice price is lower than X, then add Y; else add Z. |
|
Fixed Price per Slice |
If you wish to view charging sessions according to IEC and give a fixed price. |
|
Minimum Price or Taoz Margin |
Add margin of X but ensure minimum price, e.g., Margin of 0.20. If base + margin isn't above 0.40, charge 0.40. |
|
Fixed Price or Margin per Slice |
Allows operator to handle each slice differently, e.g., Pisga based on Taoz with margin and Shefel as fixed price X. |
|
Name |
Base Tariff |
Delta |
Example |
|
Const |
Fix price all time |
- |
25¢ for kWh |
|
Taos Plus |
IEC time-based price |
Cents |
Time-based + 10¢ |
|
Taos Plus Percentage |
IEC time-based price |
Percentage |
Time-based + 20% |
|
Taos Beity Plus |
IEC fixed price |
Cents |
Time-based + 10¢ |
|
Taos Beity Plus Percentage |
IEC fixed price |
Percentage |
Time-based + 20% |
*IEC = Israel Electricity Company.
We can add base tariff items per distributor requests.
Did you find this article helpful?